USPTO Deadlines
Application History
7 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Aug 28, 2009 | MAB2 | O | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | Loading... |
| Aug 28, 2009 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
| Jan 30, 2009 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Jan 30, 2009 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Jan 30, 2009 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Jan 25, 2009 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Oct 27, 2008 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 011
Solar panels for generating electricity, wind turbines for generating electricity, hydro systems for generating electricity from water power; controllers, inverters, panels, batteries and battery arrays for use in connection with the generation, transmission, storage and consumption of electricity produced from solar, wind and hydro sources; solar hot water heaters, other hot water heaters, boilers, and other home heating systems
First Use Anywhere:
0
First Use in Commerce:
0
Classification
International Classes
011