Legal Representation
Attorney
Richard C. Glesner
USPTO Deadlines
Application History
8 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Jul 29, 2009 | MAB2 | O | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | Loading... |
| Jul 29, 2009 | ABN2 | O | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | Loading... |
| Dec 20, 2008 | GNRN | O | NOTIFICATION OF NON-FINAL ACTION E-MAILED | Loading... |
| Dec 20, 2008 | GNRT | F | NON-FINAL ACTION E-MAILED | Loading... |
| Dec 20, 2008 | CNRT | R | NON-FINAL ACTION WRITTEN | Loading... |
| Dec 13, 2008 | DOCK | D | ASSIGNED TO EXAMINER | Loading... |
| Sep 16, 2008 | MDSC | O | NOTICE OF DESIGN SEARCH CODE MAILED | Loading... |
| Sep 15, 2008 | NWAP | I | NEW APPLICATION ENTERED | Loading... |
Detailed Classifications
Class 006
Construction elements made of metal, namely, braces; Construction elements made of metal, namely, shores; Construction elements made of metal, namely, supports
First Use Anywhere:
Jan 1, 2008
First Use in Commerce:
Jan 1, 2008
Additional Information
Design Mark
The mark consists of a reusable product with a dual purposewith both contained in a light weight galvanized steel singlepiece unit. As a railing system the product is easy to install as it inserts intothe square openings of the elbowwupporte either bfore or after the concreter floor has been pourer. The forms clam into or out of positionwith a single action of the lever that is attached to the railing post. The reals can be temporarily removed for accessibility reasons and reused on the same or different construction sites indefinitely.
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
006