Legal Representation
Attorney
Jaclyne D. Wallace
USPTO Deadlines
Next Deadline
2890 days remaining
Section 8 & 9 (20-Year) Renewal Due (Based on registration date 2013-09-24)
Due Date
September 24, 2033
Grace Period Ends
March 24, 2034
Application History
50 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| Jun 21, 2024 | 89AG | O | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | Loading... |
| Jun 21, 2024 | NA89 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | Loading... |
| Jun 21, 2024 | RNL1 | Q | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | Loading... |
| Jun 21, 2024 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Mar 20, 2024 | E89R | I | TEAS SECTION 8 & 9 RECEIVED | Loading... |
| Nov 3, 2023 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Nov 3, 2023 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Nov 3, 2023 | COAR | I | TEAS CHANGE OF OWNER ADDRESS RECEIVED | Loading... |
| Nov 3, 2023 | TCCA | I | TEAS CHANGE OF CORRESPONDENCE RECEIVED | Loading... |
| Nov 3, 2023 | CHAN | I | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | Loading... |
| Sep 24, 2022 | REM2 | E | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | Loading... |
| May 20, 2020 | NA85 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | Loading... |
| May 20, 2020 | C15A | O | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | Loading... |
| Apr 1, 2020 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Feb 6, 2020 | E815 | I | TEAS SECTION 8 & 15 RECEIVED | Loading... |
| Mar 28, 2019 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Mar 28, 2019 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Sep 24, 2018 | REM1 | E | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | Loading... |
| Dec 6, 2013 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Dec 6, 2013 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Sep 24, 2013 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Aug 21, 2013 | SUNA | E | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | Loading... |
| Aug 20, 2013 | REGV | O | LAW OFFICE REGISTRATION REVIEW COMPLETED | Loading... |
| Aug 19, 2013 | CNPR | P | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | Loading... |
| Aug 15, 2013 | SUPC | I | STATEMENT OF USE PROCESSING COMPLETE | Loading... |
| Aug 2, 2013 | IUAF | S | USE AMENDMENT FILED | Loading... |
| Aug 2, 2013 | EISU | I | TEAS STATEMENT OF USE RECEIVED | Loading... |
| Feb 8, 2013 | EXRA | E | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | Loading... |
| Feb 7, 2013 | EX5G | S | SOU EXTENSION 5 GRANTED | Loading... |
| Feb 4, 2013 | EEXT | I | SOU TEAS EXTENSION RECEIVED | Loading... |
| Feb 3, 2013 | EXT5 | S | SOU EXTENSION 5 FILED | Loading... |
| Aug 17, 2012 | EXRA | E | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | Loading... |
| Aug 16, 2012 | EX4G | S | SOU EXTENSION 4 GRANTED | Loading... |
| Aug 2, 2012 | EXT4 | S | SOU EXTENSION 4 FILED | Loading... |
| Aug 2, 2012 | EEXT | I | SOU TEAS EXTENSION RECEIVED | Loading... |
| Feb 4, 2012 | EXRA | E | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | Loading... |
| Feb 3, 2012 | EX3G | S | SOU EXTENSION 3 GRANTED | Loading... |
| Jan 26, 2012 | EXT3 | S | SOU EXTENSION 3 FILED | Loading... |
| Jan 26, 2012 | EEXT | I | SOU TEAS EXTENSION RECEIVED | Loading... |
| Aug 10, 2011 | EXRA | E | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | Loading... |
| Aug 9, 2011 | EX2G | S | SOU EXTENSION 2 GRANTED | Loading... |
| Aug 2, 2011 | EXT2 | S | SOU EXTENSION 2 FILED | Loading... |
| Aug 2, 2011 | EEXT | I | SOU TEAS EXTENSION RECEIVED | Loading... |
| Feb 18, 2011 | EXRA | E | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | Loading... |
| Feb 17, 2011 | EX1G | S | SOU EXTENSION 1 GRANTED | Loading... |
| Feb 17, 2011 | AITU | A | CASE ASSIGNED TO INTENT TO USE PARALEGAL | Loading... |
| Feb 2, 2011 | EXT1 | S | SOU EXTENSION 1 FILED | Loading... |
| Feb 2, 2011 | EEXT | I | SOU TEAS EXTENSION RECEIVED | Loading... |
| Aug 3, 2010 | NOAM | E | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | Loading... |
| Jun 8, 2010 | NPUB | E | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | Loading... |
Detailed Classifications
Class 009
Power tools and attachments therefor for automotive and industrial use, namely, valve vacuum testing equipment for measuring the ability of a valve to hold and maintain a seal or vacuum during the operation of an engine; plug adaptors; manually operated tools and attachments therefor for automotive and industrial use in measuring and testing engines and generators in connection with automotive, engine and vehicle diagnostics, maintenance and repair, namely, a measuring system comprised of a manometer, plugs and caps for checking and monitoring the passage of fluids and gases during the operation of an engine, fuel pump timing tools consisting of a pressure indicator and wrench to permit the in-situ adjustment of fuel pump timing; [ weight assist checking pressure gauges and scales used to measure the weight assist plunger protrusion during assembly of the fuel pump of an engine, ] manual hydrostatic leak testing systems comprised of a pressure regulator and pressure gauge used for testing and detecting leaks in the cylinder heads in an engine, injection nozzle testing gauges to measure performance of the opening of the nozzle of a fuel injector in an engine, and to measure the pressure, leakage, chatter and spray pattern of a nozzle type fuel injectors [ , hand operated pulley adapting apparatus consisting of a laser light detector, an alignment block, sockets and cords, all used to align two pulleys or to align a pulley with an engine component ]
First Use Anywhere:
Jan 25, 2008
First Use in Commerce:
Jan 25, 2008
Classification
International Classes
009