Legal Representation
Attorney
April L. Besl
USPTO Deadlines
Next Deadline
1506 days remaining
Section 8 & 9 Renewal Due (Principal Register) (Based on registration date 20100309)
Due Date
March 09, 2030
Grace Period Ends
September 09, 2030
Application History
50 events| Date | Code | Type | Description | Documents |
|---|---|---|---|---|
| May 14, 2025 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Jun 28, 2023 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Feb 3, 2021 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Jan 20, 2021 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Sep 9, 2020 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Aug 12, 2020 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| May 21, 2020 | NA89 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | Loading... |
| May 21, 2020 | RNL1 | Q | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | Loading... |
| May 21, 2020 | 89AG | O | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | Loading... |
| May 21, 2020 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Mar 9, 2020 | E89R | I | TEAS SECTION 8 & 9 RECEIVED | Loading... |
| Jan 15, 2020 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Mar 9, 2019 | REM2 | E | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | Loading... |
| Apr 5, 2018 | ARAA | I | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | Loading... |
| Apr 5, 2018 | REAP | I | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | Loading... |
| Aug 17, 2016 | NA85 | E | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | Loading... |
| Aug 17, 2016 | C15P | O | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | Loading... |
| Aug 16, 2016 | EROP | I | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | Loading... |
| Jul 13, 2016 | PR23 | O | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | Loading... |
| Jul 13, 2016 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Jun 8, 2016 | EROP | I | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | Loading... |
| Mar 30, 2016 | PR23 | O | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | Loading... |
| Mar 30, 2016 | APRE | A | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | Loading... |
| Mar 9, 2016 | E815 | I | TEAS SECTION 8 & 15 RECEIVED | Loading... |
| Dec 16, 2015 | ASCK | I | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | Loading... |
| Jan 22, 2014 | ASGN | I | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | Loading... |
| Mar 9, 2010 | R.PR | A | REGISTERED-PRINCIPAL REGISTER | Loading... |
| Jan 28, 2010 | DP1B | I | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | Loading... |
| Dec 30, 2009 | IUCN | S | NOTICE OF ALLOWANCE CANCELLED | Loading... |
| Jan 4, 2010 | AITU | A | CASE ASSIGNED TO INTENT TO USE PARALEGAL | Loading... |
| Dec 30, 2009 | D1BR | I | TEAS DELETE 1(B) BASIS RECEIVED | Loading... |
| Jul 14, 2009 | NOAM | O | NOA MAILED - SOU REQUIRED FROM APPLICANT | Loading... |
| Apr 21, 2009 | PUBO | A | PUBLISHED FOR OPPOSITION | Loading... |
| Apr 1, 2009 | NPUB | O | NOTICE OF PUBLICATION | Loading... |
| Mar 19, 2009 | PREV | O | LAW OFFICE PUBLICATION REVIEW COMPLETED | Loading... |
| Mar 19, 2009 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Mar 19, 2009 | XAEC | I | EXAMINER'S AMENDMENT ENTERED | Loading... |
| Mar 19, 2009 | GNEN | O | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | Loading... |
| Mar 19, 2009 | GNEA | O | EXAMINERS AMENDMENT E-MAILED | Loading... |
| Mar 19, 2009 | CNEA | R | EXAMINERS AMENDMENT -WRITTEN | Loading... |
| Mar 19, 2009 | ZZZX | Z | PREVIOUS ALLOWANCE COUNT WITHDRAWN | Loading... |
| Mar 9, 2009 | PBCR | Z | WITHDRAWN FROM PUB - OG REVIEW QUERY | Loading... |
| Feb 25, 2009 | PREV | O | LAW OFFICE PUBLICATION REVIEW COMPLETED | Loading... |
| Feb 23, 2009 | CNSA | P | APPROVED FOR PUB - PRINCIPAL REGISTER | Loading... |
| Feb 10, 2009 | TEME | I | TEAS/EMAIL CORRESPONDENCE ENTERED | Loading... |
| Feb 9, 2009 | CRFA | I | CORRESPONDENCE RECEIVED IN LAW OFFICE | Loading... |
| Feb 9, 2009 | ERSI | I | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | Loading... |
| Oct 14, 2008 | RCSC | S | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | Loading... |
| Apr 14, 2008 | RCSC | S | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | Loading... |
| Apr 10, 2008 | RCCK | S | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | Loading... |
Detailed Classifications
Class 006
Metallic building materials, NAMELY, METAL BUILDING PANELS, METAL ROOFING, Metal decking boards, METAL CEILING PANELS, METAL DOOR AND WINDOW FRAMES AND CASINGS, METAL BOARDS FOR FLOORING, METAL BEAMS, GIRDERS AND JOISTS, METAL SHEETS AND PLATES; metallic materials for civil engineering, drainage, erosion, soil control and landscaping purposes, NAMELY, METAL PANELS, METAL BEAMS, GIRDERS AND JOISTS, METAL SHEETS AND PLATES; structural materials made from metal, NAMELY, FRAMEWORKS OF METAL FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, REINFORCING MATERIALS OF METAL FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, METAL CEILING SUPPORTS, METAL FLOORING SUPPORTS, METAL ROOFING SUPPORTS, BUILDING LININGS OF METAL, BUILDING WALL CLADDING OF METAL; metallic cages STRUCTURES and METALLIC MULTI-COMPARTMENTAL STRUCTURES for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; metallic multi-compartmental structures for forming bastions and gabions
Class 017
Plastics in extruded form FOR GENERAL INDUSTRIAL USE; plastics IN EXTRUDED FORM for agricultural, horticultural, and/or civil engineering use, NAMELY, CELLULAR PLASTIC SHEETS FOR SLOPE STABILIZATION AND/OR SOIL RETENTION; plastic sheets; plastic films; packing and stopping materials FOR FORMING SEALS; INSULATING MATERIALS, NAMELY, SHEETS OF PLASTIC FABRIC AND POLYURETHANE FOAM FOR USE IN BUILDING; fibers of plastic materials FOR USE IN BUILDING
Class 019
Non-metallic building materials, NAMELY, NON-METALLIC BUILDING PANELS, NON-METALLIC ROOFING, NON-METALLIC decking boards, NON-METALLIC CEILING PANELS, NON-METALLIC DOOR AND WINDOW FRAMES AND CASINGS, NON-METALLIC BOARDS FOR FLOORING, NON-METALLIC BEAMS, GIRDERS AND JOISTS, NON-METALLIC SHEETS AND PLATES; geotextile materials, NAMELY, GEOTEXTILE FABRIC AND SHEETING FOR BUILDING, CONSTRUCTION, CIVIL ENGINEERING, DRAINAGE, EROSION, SOIL CONTROL AND LANDSCAPING; non-metallic materials, NAMELY, NON-METALLIC PANELS, NON-METALLIC BEAMS, GIRDERS AND JOISTS, NON-METALLIC SHEETS AND PLATES; non-metallic structural materials, NAMELY, NON-METALLIC FRAMEWORKS FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, NON-METALLIC REINFORCING MATERIALS FOR BUILDINGS, WALLS, SLOPES AND RIVERBANKS, NON-METALLIC CEILING SUPPORTS, NON-METALLIC FLOORING SUPPORTS, NON-METALLIC ROOFING SUPPORTS, NON-METALLIC BUILDING LININGS, NON-METALLIC BUILDING WALL CLADDING; non-metallic structures and NON-METALLIC MULTI-COMPARTMENTAL STRUCTURES for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; geotextile structures for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; non-metallic cage structures and non-metallic multi-compartmental structures for forming bastions and gabions; plastic structures for holding sand, earth, mud, stones, building rubble, concrete and/or snow used for forming barrier or defense walls; GEOTEXTILES FOR USE IN CONNECTION WITH PUBLIC WORKS CONSTRUCTION, MILITARY DEFENSE CONSTRUCTION, SOIL STABILIZATION AND FLOOD DEFENSE CONSTRUCTION
Class 022
Synthetic textile fibers; fibers of plastics materials, NAMELY, NATURAL PLANT FIBERS FOR USE AS FILLER FOR PLASTIC COMPOUNDS THAT ARE USED IN THE FURTHER MANUFACTURE OF PLASTIC BUILDING MATERIALS
Class 024
NON-WOVEN MATERIALS, FABRICS AND SHEETS MADE FROM POLYPROPYLENE AND/OR POLYETHYLENE; NON-WOVEN MATERIALS, FABRICS AND SHEETS MADE FROM POLYPROPYLENE AND/OR POLYETHYLENE FOR USE AS COVERINGS OR LININGS FOR BASTION DEFENSE WALLS, GABIONS AND OTHER PROTECTIVE STRUCTURES
Class 037
building construction services; BUILDING maintenance and repair services; CONSTRUCTION project management; construction management; LAND DEVELOPMENT SERVICES, NAMELY, PLANNING AND LAYOUT OF RESIDENTIAL AND/OR COMMERCIAL COMMUNITIES, AND INSTALLATION OF IRRIGATION SYSTEMS; BUILDING CONSTRUCTION CONSULTANCY; CONSTRUCTION LANDSCAPING CONSULTANCY; new construction site development AND EARTHWORKS CONSULTANCY
Class 042
ENGINEERING; CIVIL ENGINEERING; STRUCTURAL ENGINEERING; GEO-TECHNICAL AND/OR ENVIRONMENT ENGINEERING
Class 045
[ Security guard services for the protection of property and individuals ]
Additional Information
Color Claim
Color is not claimed as a feature of the mark.
Classification
International Classes
006
017
019
022
024
037
042
045